Case study: Aircraft components
A special rig was designed and made for high speed pressure cycling of two aircraft undercarriage components simultaneously. The complex load cycle required four different pressure levels to simulate pressures experienced by the components during taxi, take-off and landing. The number of test cycles was approximately 17 million.
Custom test rig in temporary, isolated, separately air conditioned enclosure
|
Pressure cycles
|